100MW Shanxi Ruicheng Centralized PV Power Plant
The project is located in mountainous terrain and adopts a single-column design, which flexibly adapts to the undulations of the terrain and fully improves the land utilization rate, and has a strong resistance to wind and snow, which ensures the stable output of 100MW of clean energy and sets a model for the development of green energy.